Yep, I actually used your findings to validate what I got. Let me put together my finding and solutions and share them with you.
Correct, I initially planned to have 32kWh total but found out I could have 16KWh at the back fuel tank space and 32kwh in the front bonnet space (which is basically empty at this point
) for 48kWh total.
So targeting to have the first drive using the 16kWh with the 32kwh for phase 2.
Correct, I initially planned to have 32kWh total but found out I could have 16KWh at the back fuel tank space and 32kwh in the front bonnet space (which is basically empty at this point
So targeting to have the first drive using the 16kWh with the 32kwh for phase 2.