I would just like to say

This site contains affiliate links for which LandyZone may be compensated if you make a purchase.
Evening all... we had a lovely sunny day nice n warm :D:D
Todays happenings.... Went to the boat yard noo owner making fry up for the full team :)
Loaded a ship with pallets of new rope using the Manitou. Sprayed watered down pva
over our temp building walls after pressure washing them. Foosty n paint peeling of the
walls as its been unused for a few years.
Got 2 free "BOATS" needing repairs, got a buyer for one of them before its fixed.:D

Also got a good wee job in... 40foot boat needing a full refurb tis been flooded inside for years.
replace/repair all the wood work including new teak decks hand rails.
Design & build a BBQ & seating area on the fly bridge. Repair all damaged grp
gel coat, Remove engines & anything else it needs an fit all new gear.
Basically start at the top an work out way down & make it mint.
Good wee job. :D
 
Last edited:
Had to nip to scroofix and get some drain roads though as me pipes were blocked :rolleyes:
I fink we have had a similar day. Went to Wix to get a few fittings so's I could rearrange the wastes from the kitchen to the gully outside. Got back and got stuck into the job, and then found the yard gully is blocked up. Out with me drain rods and jetting gear, got it cleared whilst giving myself a good soaking with stinky sludgy water. Memo to self; don't wash yer cement mixer out near the gully in future :rolleyes:
 
Evening all... we had a lovely sunny day nice n warm :D:D
Todays happenings.... Went to the boat yard noo owner making fry up for the full team :)
Loaded a ship with pallets of new rope using the Manitou. Sprayed watered down pva
over our temp building walls after pressure washing them. Foosty n paint peeling of the
walls as its been unused for a few years.
Got 2 free "BOATS" needing repairs, got a buyer for one of them before its fixed.:D

Also got a good wee job in... 40foot boat needing a full refurb tis been flooded inside for years.
replace/repair all the wood work including new teak decks hand rails.
Design & build a BBQ & seating area on the fly bridge. Repair all damaged grp
gel coat, Remove engines & anything else it needs an fit all new gear.
Basically start at the top an work out way down & make it mint.
Good wee job. :D
You call that "wee"? I'd call that "the sort of job I'd never finish before I died even if I tried really feckin hard".:rolleyes::rolleyes::rolleyes:
 
Brmm! Brmm!:D:D:D

More like Brum Brum.....
upload_2021-3-19_20-54-18.jpeg
 
Back
Top