Been quite the day today.
Boss asked me to weld up some dollys to help move timber around the yard, happy to oblige!
Welding is deffo getting better but still plenty of room to improve!
Made from 60x30x3mm steel. Designed to hold roughly 1.25 tonne per dolly. Work very well in the workshop.
On top of that a HUGE delivery arrived from Hungary which had to be unloaded
After just loading this to another lorry few hours prior
On we go to unload the new lorry, teletruck got stuck on the slope
landy to the resuce!
Towed it up the slope, fully loaded n all
Shortly after the teletruck blew a seal on the power steering pump which means no lifting either or the boom could drop
Spent the next 3 hours helping the forklift engineers to fix it - Sadly didnt get it done, need to parts
Quite fun though!
Got a new forklift, but it was only a 2 tonne one so not really up to the job! Almost toppled forward into the lorry
Had to hand unload a fair bit to get the weight down!
Eventually got it all off and in, around even on the yard. Dollys made moving them in much easier! Our shutter is 3.5m wide some of timber is 6m
Theres even more outside!!
Time for a pint