Finished stripping the steel parts from the tub today. So far, small remedial work only required except the B pillar and seat belt mountings.
IMG_8815.jpeg

IMG_8816.jpeg


B pillar YRM patches etc will be ordered soon.

The rear corner cappings are a mixed result. The RH is reusable and will be stripped & plated but the LH is too rusty to bother with. The good news is the LH one on the other body looks sound.

Progress on the new wings too with the LH now stripped. The headlights are in much better shape than the original and the Deutsch waterproof fasteners swapped over with new bezels fitted. They are ready to go back on...but we are some way off that.

In the next few weeks I hope to get Izzy out of the garage and lift the roof, side panels and soon to be defunct tub off. The grandson has been advised there are many tasks waiting for half term.
 
Occasionally you find things and think "What made you think this was a good idea?". This looked like a act of automotive electrial self harm.

One of the headlight wires had a "splice" cut into it...I say splice but it struggles to qualify. It was wrapped in a piece of blue insulation tape:

IMG_8822.jpeg


It looked like the remains of one of those awful plastic splices. Along with the bullet crimpts it had to go.

Result with fresh harness wrapping, adhesive shrink wrap and a decent connector:

IMG_8825.jpeg
 

Similar threads