- Posts
- 351
- Location
- Poole Dorset
Hi All,
Based on cost of replaceing with new, against cleaning and welding in a couple of patches.
There are two places that need cutting out plus gnawed metal which the tin worm has munched a bit.
1983 series 3.
Worth repairing?
As well as that. How would you reconnect it to the pillar? There were 15 spots holding it together.... plug welds or seam?
cheers Peter
Based on cost of replaceing with new, against cleaning and welding in a couple of patches.
There are two places that need cutting out plus gnawed metal which the tin worm has munched a bit.
1983 series 3.
Worth repairing?
As well as that. How would you reconnect it to the pillar? There were 15 spots holding it together.... plug welds or seam?
cheers Peter