nick2303
Well-Known Member
- Posts
- 4,255
- Location
- Leeds (not by choice)
ok i'm after some tyres...
mrs wants drive doin...
the drive covers an area 17ft long x 12ft wide, then it widens over the next 23ft to 17ft wide..
so total length is 40ft width varies...
its been dug out then some "crusher run" put down bout 4 inch deep..
so will need diggin out again, i have a use for the stuff dug out so can be left on site and dont need to be removed..
i need an idea of cost for diggin out, shuttering and the concreting..
the last 23 ft slopes to the road and will need a sump drain thingy..
anyone in leeds gimme a quote?
or can anyone "in the trade" gimme an idea of cost..
cheers...
mrs wants drive doin...
the drive covers an area 17ft long x 12ft wide, then it widens over the next 23ft to 17ft wide..
so total length is 40ft width varies...
its been dug out then some "crusher run" put down bout 4 inch deep..
so will need diggin out again, i have a use for the stuff dug out so can be left on site and dont need to be removed..
i need an idea of cost for diggin out, shuttering and the concreting..
the last 23 ft slopes to the road and will need a sump drain thingy..
anyone in leeds gimme a quote?
or can anyone "in the trade" gimme an idea of cost..
cheers...