DOUBLE WOODEN CAR PORT & MUSIC STUDIO BUILD

This site contains affiliate links for which LandyZone may be compensated if you make a purchase.
Bot o cladding finished today, but its too hot besides mates appeared with beers n snags for the BBQ so tools down.

IMG_7509.JPG
 
Finally wired in SWA to waterproof consumer unit, been running of stention lead to garge up till now.
Had to tug it through UG conduit to garg, for now its running off Garge supply, still need to fit the UG 3 way boat connector and join the SWA's
signal-2022-09-25-170845.jpeg
 
Last edited:
This stuff is superb very pleased. Chipstick D4 Liquid PU Foaming.
It has the highest water resistant rating of its class and is suitable for interior and exterior use.
Highly waterproof, Good thermal resistance (up to 140°C), Meets EN 204 requirements

Screenshot 2023-08-25 at 10.29.06.jpg
 
Last edited:
Spraying ROXIL on flooring today, using a weedsprayer.
Topside and underside x 2 coats looking forward to getting misted in the face....

Screenshot 2023-08-25 at 18.58.14.jpg
 
Last edited:
1st floor wiring to csu, sockets & lighting.
Rough fix to complete flooring.
Sockets up are not fitted yet, just the wiring.
Lights up are fitted but are twinned to gnd floor for now, eventully will be switched from nr staircase.

IMG_8613.JPG
 
Mate knocked over his large hot black coffee on to the floor yesterday FFS!

Mopped with tissue, you cant even tell where it was spilt, nice one Roxil!
 
New grates, new fire bricks, full clean out. stack joints re done and fire in, so all ready for winter, and its passed the visla inspection. Just got to clean up after roding the flue and making a total mess.
In the spring fitting the same one into the car port. (BFM Portway-1 multifuel HETAS Approved)
IMG_8805.JPG
 
Back
Top