defenderdean
New Member
- Posts
- 26
- Location
- Middlesex
New to the forum but thought id start my rebuild thread just as its getting underway.
So in November 2011 i decided to purchase a defender 90 with the intention of using it offroad and over winter, as i couldnt drive my car for 3 weeks in 2010 due to snow. Winter past and the defender has pretty much sat there since with not much use due to having my job and starting a business venture. Now ive got some time i have decided to fully strip it down and give it a new lease of life. Heres how i brought it in 2011:
Looked quite a mess so a quick rattle can job and 4 days later it turned into something a bit more respectful:
Thats how it stayed till about a week ago when i started to strip it down. So Progress began buy stripping the dash down and finding some quite butchered wiring as you do:
This was all cleared out.Even some twin and earth and lots of 12v bare cables touching metal etc:
Then proceded to strip out the rest of the interior:
Then came time to strip the body work down:
Now im at the point of taking the engine and box out. Due to having my engine crane nicked so trying to source one or wait for a digger to come along. So far the strip down has taken me 12 hours. More updates to come tomorrow if i can work out a way to get the engine out!
So in November 2011 i decided to purchase a defender 90 with the intention of using it offroad and over winter, as i couldnt drive my car for 3 weeks in 2010 due to snow. Winter past and the defender has pretty much sat there since with not much use due to having my job and starting a business venture. Now ive got some time i have decided to fully strip it down and give it a new lease of life. Heres how i brought it in 2011:
Looked quite a mess so a quick rattle can job and 4 days later it turned into something a bit more respectful:
Thats how it stayed till about a week ago when i started to strip it down. So Progress began buy stripping the dash down and finding some quite butchered wiring as you do:
This was all cleared out.Even some twin and earth and lots of 12v bare cables touching metal etc:
Then proceded to strip out the rest of the interior:
Then came time to strip the body work down:
Now im at the point of taking the engine and box out. Due to having my engine crane nicked so trying to source one or wait for a digger to come along. So far the strip down has taken me 12 hours. More updates to come tomorrow if i can work out a way to get the engine out!