Day on the welding, again.
Got the sill fitted, had to cut away the a pillar to give me clearance to get the sill in as I had welded the mounts on, but it was rotten anyway.
Used the arc welder to do the seam on the top and the sides of the B pillar, only blew holes where the floor was rotted so quite impressed, much better weld than the mig as well.
Got the outer arch in place as well, took a bit to get right for some reason, other side went on better, was half inch out to start with and the door wouldn't shut without catching so re aligned and all good now
I do wish I stopped finding rot in hard places to fix.
Got it fixed before it got out of shape, found a bit of metal with a bend that was just right.
The end is nigh, few bits of patching on the arches, footwell to weld in and some bits to fix in the back then the fun stuff begins, cleaning the metal off for painting.
Took the pedal box out to make it easier access for welding. As it's going manual it needed to come out anyway.
More work on Friday.
Was good to see djdommyb, welcome distraction