I'm on a bit of a tight time line for my engine swap. I have a newly built one to go in and it should be a straight one out one in affair (hopefully).
I've changed plenty of other engines in the past, and I'll have the added luxury of an overhead crane, workshop, forlift etc to use.
If I went for it, started after work one evening, how quickly could I expect to get it done? Its a 300 in a 90, like for like
I've changed plenty of other engines in the past, and I'll have the added luxury of an overhead crane, workshop, forlift etc to use.
If I went for it, started after work one evening, how quickly could I expect to get it done? Its a 300 in a 90, like for like