Ex-army 90 FFR Rebuild

This site contains affiliate links for which LandyZone may be compensated if you make a purchase.
Fnally some pictures!

The tub is on now and has started being repainted in sand at the back end. Also I managed to fit the new rear bumperettes to the crossmember





The new fuel tank has also been installed as has the seatbox (but only loosely atm until we finish bolting up all of the other bodywork





On to the bulkhead, the gearbx tunnel part of the bulkhead has to be cut out for the bulkhead to fit over the bellhousing properly



Slowly working our way through the wiring



The bulkhead has also been odified slightly to take the original throttle cable and pedal



Wiper motor and heater matrix also installed






Engine was stripped and rebuilt and has now been re-installed (No pics of this but have alink to the rebuild of my own 2.5 in my signature





 
Done a little more work today, the clutch hydraulics are now fully plumbed in and I started to strip down the front doors ready for repair work(there currently upside down with diesel down the thread holding the door top to bottom as theyre siezed in place
 
Back
Top