htr
Well-Known Member
- Posts
- 1,588
- Location
- Central Otago, Southern New Zealand
The final fitting then guard back on.
All stock 65mm PVC down pipe parts - 3 x 90º and 2 x 45º. I used short sections of plain pipe for internal joiners. I did have to shorten the two joining sockets at the bottom of the U. The 45º bend goes over the guard support bracket which I had to nibble a piece off. The brown area is where I heated the pipe which I stuffed with rags and put a gentle bend to aline it with the bodywork. The rags help to stop it kinking / wrinkling. You can see why I think a snorkel kit is a natural addition with this. Successfully attached to iner wing using mod'ed down pipe brackets.

All stock 65mm PVC down pipe parts - 3 x 90º and 2 x 45º. I used short sections of plain pipe for internal joiners. I did have to shorten the two joining sockets at the bottom of the U. The 45º bend goes over the guard support bracket which I had to nibble a piece off. The brown area is where I heated the pipe which I stuffed with rags and put a gentle bend to aline it with the bodywork. The rags help to stop it kinking / wrinkling. You can see why I think a snorkel kit is a natural addition with this. Successfully attached to iner wing using mod'ed down pipe brackets.
