Thanks Redhand, that's a lot of ifs, but relevant, so let's assume wet concrete (ridged by tamping, not smooth), Grabber 245 tyres on 20" with 2mm min tread and inflated to suit the task (whatever that is), two 100 kg bodies up front and even distribution of no more than 200 kg tied down in...