hi what type of compressor are you using for the air bags
Not sure yet, have been looking at a digital read out and control unit from air systems.
Sorry been busy doing a full nut and bolt rebuild for a customer...
However there has been some progress made on the bulkhead stretch.
First the replacement pillars were offered up, jigged and tack welded into position
Then the very poorly footwells were cut out along with the lower part of the original door pillar.
A 5mm thick brace bar has been welded along the length of the bulkhead between the new pillars and welded at the bottom of the transmission tunnel either side.
This is to keep everything square and will remain on the finished bulkhead.
Only the section crossing the transmission tunnel will be trimmed out.
The bulkhead mounting points will also be welded to this so the chassis will remain without any modification.
Also extra strength has been added for the windscreen mounting points with new crush tubes inside the box section that has been added.
Then A replacement footwell was cut down to extend the well, this will give an extra 6" of space to put my size 11's on long journeys
Then more steel has been cut to size and folded to finish off the footwell either side.
Both sides have now been completed to this point. All that remains is to cut out the old door seal lip and cover in the frame that has been added. Add the new door rubber lip to both sides and then to make a few more minor repairs on some further rot.