This weekend...
*
Fabb'd second row inner sills & brackets & welded them on. Loosely fitted body crossmember.
Stripped all front lights off ready for new ones.
Refitted the fuel tank, managed to jump start it with a battery off a Nissan Micra!
Next week is fabricating the door shuts at the front of the tub, fitting tub braces, test fit the tub & put the exhaust on.
*
Pics to follow...
*
Still to do...
*
Drivers front outrigger, footwell repair sections, lots of wiring!, tyres, brakes, front diff, paint/retrim inside, door locks....Mot'd, taxed, insured by Christmas Day??? Hope so, otherwise I'll have to find her another present!