joe1972
Well-Known Member
True Nick. Yeah, ultimately it is bodywork that takes the hit. The bottomes of the doors on mine are a slightly different shape!. I've just received the last of a load of box section n tubing to make up some rock sliders now its getting warmer n drier outside. just over £30 in materials n some cutting n welding practice to make something custom sounds better to me than over £250 for something I'm gonna bash the crap out of!
Ultimately its prob a better idea havin something 'spare' to bash about in at the pay n play days. (n also do the black routes without stressing about breakin a daily driver)
Ultimately its prob a better idea havin something 'spare' to bash about in at the pay n play days. (n also do the black routes without stressing about breakin a daily driver)