Jack300tray

Member
Hi all, Iv had the truck or a while now and thought I'll share my progress with others.

So far Iv tubed the front end and reconditioned the engine. Not to long ago I decided to chop the back and make a start on the tray so here are a few pictures to get the ball rolling
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
 
Started on the electrics today and long story short, I no longer have the keys to the truck :( so Iv decided to wire up my own start up panel! :) As I'm putting the batteries behind the seats, the plan is to put a panel on the central arm rest replacing the lid. I will also put switches for roof lights and other accessories. Iv bought a key switch to wire up to the fuel stop solenoid.
image.jpeg
 
Finally got the cab finished today after the cold spell we have had, thought I'll crack on while we have had that bit of extra light at night :)
image.jpeg
image.jpeg
 
Rockets?! If only haha may have to rig some up ;) back to the switchs, key switch is for the fuel stop on the pump. Rocker switchs are for first stage ignition and second stage with the start button to fire the old girl up :)
 
Tube work is bent and ready to weld!! :) Will be glad to see it start taking shape :) I've also decided to cut the chassis down some more to tidy it up with the tray.
IMG_0806.JPG
IMG_0808.JPG
IMG_0807.JPG
 
New fuel tank on and frame made! Just needs I lick of paint. Plan is to raptor the whole truck! No more scratches I hope hahaha
IMG_1514.JPG
IMG_1513.JPG
 
So the rub down has started!! Colour scheme will be black raptor with orange bead lockers and the flex kit/trailing arms etc.
IMG_1530.JPG
 
Last edited:

Similar threads