satchmolips
Active Member
- Posts
- 422
- Location
- Worcestershire
My 110 Pick up failed MOT on a few holes in chassis, mainly on the large box section piece that sits under tub. My welder (who is brilliant) said Tub would have to come off to do it. (11.45 this morning). Got it back to him by 3.30 with tub off which I didnt think was bad for first time!
A few things will need sorting and could do with help please. 1) The diesel tank filler, has a metal section which is held to tub by by 4 screws (by filler cap) and then goes into the rubber hose. This has a hole in the metal bit (with the vent tube on it) it so will need a new one. What is it called? Can't find one anywhere on www. Also the rubber hose looks like it may be a small fortune?
2) Had to take roof off, which was obviously well sealed with some kind of rubber compund above windscreen. Can I get some new and what's it called?
Finally, not looking forward to connecting all the loom wires at the back end when its all back together
A few things will need sorting and could do with help please. 1) The diesel tank filler, has a metal section which is held to tub by by 4 screws (by filler cap) and then goes into the rubber hose. This has a hole in the metal bit (with the vent tube on it) it so will need a new one. What is it called? Can't find one anywhere on www. Also the rubber hose looks like it may be a small fortune?
2) Had to take roof off, which was obviously well sealed with some kind of rubber compund above windscreen. Can I get some new and what's it called?
Finally, not looking forward to connecting all the loom wires at the back end when its all back together