BIOSBILL
New Member
- Posts
- 147
- Location
- Norfolk UK
Hi,
Just been searching Landy stuff online. Found some people talking about rebuilding a LR S3. They all think that it will take much longer than 3 Months. I was planning to change the bulkhead on my S3, as well as painting the complete chassis, and possible fitting a new Autosparks loom.
My SWB S3 only came of the road about 1 month ago when its MOT ran out, and I dont think it will get another at the moment, only due to the rusty bulkhead.
I cant see why doing the above jobs is going to take much longer than 3 months?
My engine has just been rebuilt, and the gearbox/drive train is perfect, so i wont be touching them too much. (well other than replacing a block coolant drain tap, while the wings are off!)
What do you think?
Just been searching Landy stuff online. Found some people talking about rebuilding a LR S3. They all think that it will take much longer than 3 Months. I was planning to change the bulkhead on my S3, as well as painting the complete chassis, and possible fitting a new Autosparks loom.
My SWB S3 only came of the road about 1 month ago when its MOT ran out, and I dont think it will get another at the moment, only due to the rusty bulkhead.
I cant see why doing the above jobs is going to take much longer than 3 months?
My engine has just been rebuilt, and the gearbox/drive train is perfect, so i wont be touching them too much. (well other than replacing a block coolant drain tap, while the wings are off!)
What do you think?