yep. carefully drilled 2x 7mm pilot holes about 8mm deep to break through side faces, 10mm in from edge of outer casing of vcu at opposite ends and sides of it, tapped holes m8, drilled 3mm pilot hole through an old m8x16 bolt, cut head off bolt to act as a pipe connection, heated viscous coupling with hair dryer for about 15 minutes, connected line to m8 bolt screwed into vcu and onto compressor. blew treacle out of coupling, then flushed with thin oil.
force filled with gear oil. fitted m8 short bolt with dowty washer to seal.
and what exactly did that achieve?