1988smithy
Well-Known Member
..will put up on the anything goes forum
I'd go with 'other stuff' old pal
..will put up on the anything goes forum
24hrs dry.
View attachment 175958
gets a mistin when i take dogs out for last wazKeep it damp for a couple of days in this heat
Oak posts n beams, log lap sides.....using my same deign from my veranda-lean to fing, like this....Proper job that
Brick & timber or timber frame?
Still got stainless exhaust to fit.
Summer jobs list:
Replace clutch n spigot bearing, slave cylinder n pipes.
Brakes lines front and back
Fit stainless exhaust
Finish middle leccy box (might wait until i do clutch)
A frame BJ replace
x 2 new doors
Full re-spray ( raptor poss)
Fit new wheels ( once i have bought some fooking nuts n tyres o course.
Also have an MTD115 lawn tractor that needs
New cutter deck fan x3 belts n blade.
Fit new exhaust mod i have made
So im gonna be busy!
This little poopbox has kept me busy all afternoon, changed x 3 belts, blade n fan, but fan shroud has been eaten by the tin worm,
I mean gone fubar nada goneski!
So just finished greasing up all the bearings and levers etc, ordered a new shroud.
So now its in bits on blocks in the middle of my workshop. AKA I the FKN way!
Will pop the wheels on n move it tomorrow. To be fair its a great little tractor, has a hitch and at full chat will throw you straight off if you so much as attempt a small bend, its supposed ot have a 11Hp 2 stroke-4 stroke engine, but I manage to disintegrate the conrod and the main bearing, hooning around the garden, needed a new engine, and could only find a 13.5 HP one, so ho hum in it went, so now it goes like stink!
As you would expect of course its now got LED headlights and a rear facing mini stack exhaust, stupid design ment you just got fumes in yer moosh.
Off all week and have lots to do, mostly gadding about in the truck (the real one)
View attachment 176188
I anit read through all this but looks like a good job. The shuttering can be removed next day but keep off the edges as they be soft. 6 weeks to drill is plenty you can dril after a week or so and use R Kem resin to install studs for ya postsYeah man, 28 days minimum normally we've had decent weather as well. Drill a test hole see what it's like. @Broke Again would drill it after a week
Still got stainless exhaust to fit.
Summer jobs list:
Replace clutch n spigot bearing, slave cylinder n pipes.
Brakes lines front and back
Fit stainless exhaust
Finish middle leccy box (might wait until i do clutch)
A frame BJ replace
x 2 new doors
Full re-spray ( raptor poss)
Fit new wheels ( once i have bought some fooking nuts n tyres o course.
Also have an MTD115 lawn tractor that needs
New cutter deck fan x3 belts n blade.
Fit new exhaust mod i have made
So im gonna be busy!