From battery via an in line fuse, then under fuse box area down onto chassis rail, run along to the back, up through an existing rubber bung in the O/S rear quarter floor. Cable protected in a plastic tube spot glued to the top of the chassis rail at intervals. Took all of half an hour.

cheers data
 

Similar threads