Get it now, ignore the latter part of my previous post, posted as usual before reading to the end of the thread!!Ahhhh, but the secondary and lesser part of the job is to remove the lath & plaster(internal) and wire & stucco (external) section from above the front door (6 foot by 1 foot) to let more light into the hallway (also like a cave 90% of the year). So, as they will be tramping back and forth between the two work areas it sort of makes sense, and they don't want to tramp sand/cement and plaster products into our flooring.