View from Coventry airport

image.thumb.png.cf12d8740549b83ae8b6b2f6c9dfb1b3.png
 
..... today was "hellish-hot" and not the best day to be stuck inside an airless breeze-less house laying underfloor heat pipe panels.
But! We worked it all out for the 4 zones (each of 100Metres in pipe length) and tonight they are being stuck-down to the concrete floor and tomorrow (late) we will insert all the pipework into the preformed channels.
This picture is of the "heated" area, we then put the off-cuts and spare panels onto the uncovered areas where cupboards and kitchen furniture will sit on top.

I sprang for £10 of canned beers because we were roasting and hydration must be maintained. ;):D:D
20200810_170027.jpg
 
..... today was "hellish-hot" and not the best day to be stuck inside an airless breeze-less house laying underfloor heat pipe panels.
But! We worked it all out for the 4 zones (each of 100Metres in pipe length) and tonight they are being stuck-down to the concrete floor and tomorrow (late) we will insert all the pipework into the preformed channels.
This picture is of the "heated" area, we then put the off-cuts and spare panels onto the uncovered areas where cupboards and kitchen furniture will sit on top.

I sprang for £10 of canned beers because we were roasting and hydration must be maintained. ;):D:D
View attachment 216801
Top job
 

Similar threads