sea27n

Active Member
251427E5-2B97-4194-990C-0ADC48FABB7E.jpeg
Hi all
While I have a bit of time at home I thought I would do a few jobs on the 90 that I have been putting off. The passenger foot well is wetter than the river Avon and the clutch has been slipping for the last year, so here we go:
 
I have cut out a lot of the rot, but the more you look the more you find.
8741DB19-5315-463C-A840-FDBD92CB3E00.jpeg
7DADAE6C-FE50-4530-8B5D-A24BB5A68634.jpeg

Check the drivers foot well and that is solid but will remove the floor as the whole seat box will need to come out if I am going to do the clutch as well.
 
Battery box has seen better days so that will need sorting now too.
 

Attachments

  • 67CFE077-2B63-451E-A8F3-C4B704D5A1D0.jpeg
    67CFE077-2B63-451E-A8F3-C4B704D5A1D0.jpeg
    400.9 KB · Views: 175
Yrm do nice pre made bits I fitted one of ther battery boxes on my previous 90 well priced and great bit of kit
 
959B5202-0ECA-4F15-866A-7F49AF81A593.jpeg
So here’s an update so far - new Battery box done, nice and light in alloy from YRM so many thanks to haza88 for that one.
DE395033-285D-44D1-A334-2F69E16FAE22.jpeg
 
48929CCC-0B26-4335-B9FC-CF151CF6E9F0.jpeg
48929CCC-0B26-4335-B9FC-CF151CF6E9F0.jpeg
Clutch all done and gearbox back in, no massive dramas so far, found another hole in the chassis so a bit more welding.
 

Attachments

  • 5F0F0621-39B8-4458-96EB-791BA94ADD74.jpeg
    5F0F0621-39B8-4458-96EB-791BA94ADD74.jpeg
    381.8 KB · Views: 101
C6EF4556-5FB5-4704-BB51-55F0939EAFD0.jpeg
A3E76F9E-B4C9-4296-A9BC-D411FA958AAF.jpeg
55A7203F-59F6-4E17-8F7E-9AE67654C0F0.jpeg
So a big clean up of everything and a few other little jobs done, and then start putting everything back together.
6031201B-10B6-41A2-87FF-9F5559DF5496.jpeg
 
As you can see above I had to fabricate the right hand side of the foot well, as I had to cut half of it away.
 

Similar threads