Tonks4x4
Active Member
A little update. The V8 4.2 has now been fully stripped and has been sent off to the engine centre for machining.
I have already collected the crank which is now 10thou undersized and polished ready to go.
But I have not been able to find any engineering shops to perform the machining on extending the keyway.
So I have taken it upon myself to set to with the dremel and some grinding stones, it took me an hour or two but have managed to sort it.
Here is a picture of the keyway in position and the old one to see the size difference
This is one of the grinding stones used which just happens to be 1mm thinner than the slot required
And a mock up of the crank timing gear, front cover and crank pulley to make sure everything is as it should be
All the parts can now be meticulously cleaned and painted where required in preparation of having the block back.
And then I can get on to building it back up.
Also I have purchased a pair of leather captains seats with double armrests which I intend to fit...
I have already collected the crank which is now 10thou undersized and polished ready to go.
But I have not been able to find any engineering shops to perform the machining on extending the keyway.
So I have taken it upon myself to set to with the dremel and some grinding stones, it took me an hour or two but have managed to sort it.
Here is a picture of the keyway in position and the old one to see the size difference
This is one of the grinding stones used which just happens to be 1mm thinner than the slot required
And a mock up of the crank timing gear, front cover and crank pulley to make sure everything is as it should be
All the parts can now be meticulously cleaned and painted where required in preparation of having the block back.
And then I can get on to building it back up.
Also I have purchased a pair of leather captains seats with double armrests which I intend to fit...