Currently, the series in the garage with collapsed front wheel bearings and fairly feeble brakes, Im working on a disc brake conversion for the front that should be progressing in a couple of weeks all being well. Other plans include a new gearbox as second has a nice crunch when changing down from third.
I have been contemplating a gearbox rebuild. It doesn't seem to technical... But the only thing putting me off was the time required it was looking easier to let someone else rebuild it and pay the labour costs. However I will look into it I'm rebuilding a v8 so a gearbox may as well join the list.
Excellent results top shelf job..
On a totally different note, does the timber garage suffer from mold. Had one built in October, same set up.
Look's the mutt's nuts! Well done
Got anymore pics of the dash? Have you put a head lining in it? Looks like it in the pic.
wow!!! well done and thanks for taking the time to post it up, just read the thread all the way through and if it was mine i dont think i'd ever sell it either!
quick q. what vehicle is the pas box from?
thanks it'd be good if you could post a pic once you've repositioned it, i would like to fit pas to mine tooThe pas box was from a discovery 1. It works really well but the drop arm does catch the spring when turning right during articulation. I plan to remove it and move it up a couple of inches so it doesn't catch anymore.