If all the bolts come out ok, then it's about a 3 hour job. If the fuel tank cradle is rusted too, then you might as well change that, as the front bolts of the rear sub-frame needs to be removed to replace the tank cradle.
If all the bolts come out ok, then it's about a 3 hour job. If the fuel tank cradle is rusted too, then you might as well change that, as the front bolts of the rear sub-frame needs to be removed to replace the tank cradle.
Don't forget to change diff mounts, much easier when frame is off. I powder coated mine and changed adjustable tie bars that were seized up. Good time to replace tricky brake pipes that run past fuel tank.