Mark Disco
New Member
if all i had to do was weld in the floor i'd charge £50 or a few beers.
if i had to spend an hour stripping the boot plastics out, then cut the floor out, then weld new floor, then replace everythin i'd charge about £200
if i had to spend an hour stripping the boot plastics out, then cut the floor out, then weld new floor, then replace everythin i'd charge about £200