Been putting a bit waxoil in the sections today, bit cold so warmed up on the gas for a bit and then wonder how to get it in ? I used a bit pvc tube , and a
shampoo bottle had the exact hole size for tight fir of tube and a bit of brake pipe drilled 4 holes in at 2mm dia, this was not tight so glued it in, drilled bottom channel to get along the bottom and up the sides but the hinge tubes stopped it , but the tube went all the way round to the top hinge
The rubber blocks are the buffers out of the slider slot, I measured them at 18.5 x 10mm with lengths 25 and 37mm, the longer one been getting a hammerin when door right open and chewed up rubber
I made a nylon bit about 10mm so this hits the arm first so as to
protect the rubber
The waxoil went in quite quick under gravity the holes in jet might have been better at 1.5mm ! I turned the door over and did it again using the full bottle (or half in and half on the floor lol), I had the keep the tubes warm in the pan of hot water to stop it setting in tube , it did do this once but just drop in the water again and it goes back to liquid
with it all in and stay arm connected its not opeing fully 90 deg so may need to trim the nylon, ill see how it goes but I thin
k its not gonna hit the fog light anymore, last job is just to clean off excess body sealant and paint over the areas where its showing on inside and at folded edges. job for another day