The last stage is installing the head lining itself, which for a 109 came in 3 approximately square parts; front, middle and back.
It also came with plastic rivets but i used self tapping pan head srews in case i needed to remove at a later date as the rivets are a one time only deal.
The instructions say install back section first then front and finally middle. (i installed from back to front sequentially and one of the photos shows how i could not get the drivers side of the front section quite in the right position as the middle panel prevented the curve of the corner being pushed into place)
The linings screw into the face of the gutter rail with pre drilled holes in the lining edges that follow the line of the gutter right over the rear door, but you will need to mark through these holes positions on the gutter and drill holes of a suitable diameter for your self tapping screws (4mm in my case but depends on the screws you use)
make sure your screws will not go to far through so they do not put a hole in your roof and that the screw head is wide enough not to pull through the pre drilled hole in the lining which are about 4.5mm dia.
Tip: if you can, get someone to help as holding the lining in place while marking drill holes is a 3 handed job.
The sequence is;
1. lift rear lining into place, mark holes around gutter edge (don't bother with the ones on the cross rail until after fitting middle section)
2. Drop lining and drill holes,
3. Reposition lining and screw in self tapping screws enough to prevent lining falling on head
4. Lift front lining into place and mark holes (felt pen does the trick but punch holes before drilling, gutter steel is not that easy to drill and the bit will slip if you dont)
5. Drop and drill holes around gutter line
6. Lift and screw in self tapping holes, ( loose so when you do the screws over the windscreen it pulls the linibg into place.
7. Position centre lining and mark holes
8. Drop lining and drill gutter holes
9. Reposition lining and srew into place with self tapping screws
10. Locate and drill holes into cross rails through middle and adjacent lining panels, ensuring you are drilling into the cross rail sections and not the insulation or roof skin (ensure screws are not too long to go through rail section into roof skin)
11. Tighten all screws and admire your work.
As i said, i did rear, middle then front panel which is wrong as the front panel needs to go in before the middle to allow the rear edge of the front panel to sit right. The middle panel is also a little oversize and will over lap the front and rear sections a little more that the edge so don't expect the holes of each of the panels to line up so it is crucial you know where the cross rails are before you drill.
I then installed the light fittings i had wired before installing the lining, srewing into the same gutter rails i fixed the lining to.
I also used the screw points to fix a cotton twill screen over the seat bulkhead to seperate the load space from cab.