Well we managed to trim the eaves of the roof-decking and fix the mini barge-boards on.
The weather really looked like it was going to snow and it was bitterly cold up there on the roof.
The rubber membrane is fully stuck down with latex adhesive on top and contact adhesive at all borders and the two sides.
We have run out of contact adhesive so I shall have to get some more so that we can cut the hole in the roof for the skylight.
I doesn't look like much has been done, but it has......honest!
20210407-152256.jpg
 
Well we managed to trim the eaves of the roof-decking and fix the mini barge-boards on.
The weather really looked like it was going to snow and it was bitterly cold up there on the roof.
The rubber membrane is fully stuck down with latex adhesive on top and contact adhesive at all borders and the two sides.
We have run out of contact adhesive so I shall have to get some more so that we can cut the hole in the roof for the skylight.
I doesn't look like much has been done, but it has......honest!
20210407-152256.jpg

Good job matey well done, tis coming on now.:):)
 

Similar threads