Right peeps i have 4days to change my
1. Front wheel bearings
2. Full 2" lift
3. Wax oil
4. Snorkel
5. Rtc damper
6. Steering gaurd
7. Braided brake lines
8. Side steps
9. Cut and fold chq plating for bonnet, sill bottoms, inside back door and foot wells
10. Wheel carrier for bonnet
11. Remove tyres and get wheels plastic coated
12. Fit birthday in with all this
From Friday to Monday back on road
Could it be done ?
Does any one fancy lending a helping hand ?
1. Front wheel bearings
2. Full 2" lift
3. Wax oil
4. Snorkel
5. Rtc damper
6. Steering gaurd
7. Braided brake lines
8. Side steps
9. Cut and fold chq plating for bonnet, sill bottoms, inside back door and foot wells
10. Wheel carrier for bonnet
11. Remove tyres and get wheels plastic coated
12. Fit birthday in with all this
From Friday to Monday back on road
Could it be done ?
Does any one fancy lending a helping hand ?