fergusontom
Active Member
Hi everyone
We have our old 2a SWB station wagon up at my grandparents which is in desperate need of love and care. Normal landy situation looks fine from the top but underneath chassis is rotten. So looking at swapping the chassis.
Our plan is to have some days off work and get it done quick as if we do anything else she will just end up a box of bits. Then treat it as a rolling restoration. Thing is I have no idea how long it will realistically take. There will be two of us on it all day and possibly a 3rd in the evenings
I am thinking strip it one weekend then the following start bolting her back together. So two questions really. How long to pull her to bits? How long to bolt it back together?
Thanks, Tom
We have our old 2a SWB station wagon up at my grandparents which is in desperate need of love and care. Normal landy situation looks fine from the top but underneath chassis is rotten. So looking at swapping the chassis.
Our plan is to have some days off work and get it done quick as if we do anything else she will just end up a box of bits. Then treat it as a rolling restoration. Thing is I have no idea how long it will realistically take. There will be two of us on it all day and possibly a 3rd in the evenings
I am thinking strip it one weekend then the following start bolting her back together. So two questions really. How long to pull her to bits? How long to bolt it back together?
Thanks, Tom