Cheers mate, pressure tested with boiling hot water in block at 70psi so should be all good, had new mains, big ends, reground crank, rings, cam, lifters, trimming gear, arp head studs, Conrod bolts, and a little bit of porting work to heads and inlet manifold, should be starting the ms install...