two people can just about get an 88" done in a looong weekend, leaving minor fettling/wiring/bleeding brakes/clutch etc for the evenings of the following week.
do it in as big lumps as possible, eg:
roof, side panels, rear tub in one
bulkhead with all wiring, steering, windscreen, pedals...