Tirran

Well-Known Member
working through the dismantling of my D90, target is to have it all stripped before the bad weather then I can get the refurb of the parts over winter. It needs a new chassis, which I knew about when buying so my plan is to have everything ready before buying the chassis.

Engine out and clutch off, flywheel bolts undone but the flywheel will need some persuasion to release. Gearbox and transfer box is the target for tomorrow.

Tirran
Photo%2006-07-2019%2C%2017%2024%2017.jpg
Photo%2006-07-2019%2C%2017%2024%2024.jpg
 

Similar threads